... or 'smack' ... or 'warp-overdrive' ... or 'smokin' ... or 'pedal to the metal' .........You can use rate or knots or for higher speeds: Q, smash, speed of heat....

Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
... or 'smack' ... or 'warp-overdrive' ... or 'smokin' ... or 'pedal to the metal' .........You can use rate or knots or for higher speeds: Q, smash, speed of heat....
Who the fuck says that? Sounds kinda ghey.
So, can anybody in the fleet comment on if this is actually going to happen by 2012?
http://www.defense.gov/news/newsarticle.aspx?id=55684
Basically, if you want the highlight, the Honorable Mr.Gates along with the DOD PR department say that the USMC will have "Initial Operational Capability" by 2012 with the F-35B. The report dates from August 31st of 2009.
Now, last time I checked Aviation Week the F-35B variant was having some airframe problems because of the difficulties inherent in cutting a big hole through load bearing spars for a giant lift fan, in addition to concerns about engine vibration.
http://web02.aviationweek.com/aw/ge...l&headline=F-35B Ready to Begin Stovl Testing
So what is this chatter about?
What is "Initial Operation Capability" entail in any case? Does that mean a unit using the craft that can be deployed? As in "F-35B possibly in theater by 2012"?
Other sources have the vehicle being introduced operationally as late as 2016, not to mention GAO studies that say that all the public schedules are incorrect, by perhaps as much as two years...
Anybody got the inside scoop?
The search function here was of little utility, but never mind, Google tells me that this thread addresses some of my questions:
http://www.airwarriors.com/forum/showthread.php?t=152106&page=1
If someone has more to add, feel free, as it addresses my questions, but does not really answer them.
Certainly not guys flying a beat up old 707, that's for sure.
Brett
...
Yes, please don't start new threads when same topic is already in play.
Who the fuck says that? Sounds kinda ghey.
Active augmentation is coming back in full force(read: shitty numbers), so all that should be worked out.Thanks for the link HJ. My info on the JSF being delayed came from a couple buddies, one at BAE & the other at LM. The F-35B is dragging & slowing the whole JSF acq. process down.
I just wish the Corps would wake up and realize it's gonna be delayed for a couple years. There are a lot of dudes with wings who are gonna get f'd over the next few years because of the current fixed wing situation in the Corps... less jets, too many pilots...
SF